Skip to content
MedICon Logistics

Early phase

Biomarker and first-in-human study logistics

Early-phase work where sample condition decides whether the data is usable. Collections are planned around the sampling schedule, not the other way round.

What goes wrong

01

In early-phase work the sampling schedule is the study. A pharmacokinetic series taken at fixed intervals is worth nothing if one of the samples degrades in transit, and the subject is not coming back to repeat it.

02

Collection windows are short and they are not negotiable. A courier that arrives an hour late has not inconvenienced anyone. It has removed a timepoint from the dataset.

03

First-in-human work runs under scrutiny. Every part of the chain gets examined if a result looks wrong, and transport is the first place people look because it is the part nobody watched.

Biomarkers and first-in-human studies

Early phase

  • Schedule-led routing
  • Short collection windows
  • Sample condition

What we do about it

How the work is set up.

04 points

01

Routing built around the sampling schedule

The collection times come from the protocol. We plan the route to meet them instead of asking the site to hold samples until a scheduled round arrives.

02

Short collection windows

Where a timepoint has to leave the site within a defined period, that window is what the booking is made against.

03

Handling matched to sample condition

Packing chosen for the sample type and the journey, because for biomarker work the condition on arrival is the entire value of the shipment.

04

Handled to dangerous goods rules where they apply

Trained handling for biological material and anything moving under regulated transport rules.

Questions

Asked by teams in this position.

Not covered here? Send us the detail and we will answer it directly.

Can you collect at fixed times through the day?

That is the normal shape of this work. Send us the sampling schedule and the sites involved and we will tell you what is workable before you commit to it in a protocol.

What happens if a timepoint is missed?

We would rather tell you in advance that a schedule is not achievable than agree to it and miss a timepoint. If something goes wrong on the day, you hear about it while there is still time to react, not afterwards.

Do you handle biological substances under dangerous goods rules?

We have dangerous goods trained personnel for regulated and sensitive consignments. Tell us the classification your material ships under and we will confirm the handling.

Contact

Tell us about your early phase work.

Send the product, the temperature range and the schedule you are working to. We will come back with how we would run it and what it costs.

Request a quote WhatsApp us+60 17-338 3623

Mon–Sat, 9:00 AM – 6:00 PM